This work package will deploy and evaluate the concept and prototypes that have been previously developed in the WP2, WP3 and WP4. The aim is that the partners that have been involved in the task forces will deploy the developed prototypes in their surroundings and use them to support the various user groups, including immigrants and their integration to society through more informed skills formation structures. Besides prototypes deployment in different countries and partners, Finland aims to deploy all developed prototypes, the ecosystem concept, to measure the effectiveness, usability, and/or feasibility of the technology and concept.


Main goals and project resultsResponsible / Work package Identified risks Key Performance Indicators (KPI) - measurements Definition of conceptDefinition of functionalities for prototypesDevelopment of prototypes (WP3)DeploymentCommunication and dissemination (WP5) Deliverables across timelineEvaluation

   Ecosystem and modules user scenariosMain architecture aspects and system requirementsInitial functionalities incl. interface, content and associated servicesReference group review of functionalitiesFinalized definition of functionalities incl. interface, content and associated servicesMock upHTMLPilot prototype MayPilot prototype AugustPublic versions (do we need this - all versions public?)

National deployment

(Finland - all prototypes)

International deployment

(Netherlands, Germany + possible other countries)

EuroPass case study

 

Framework architecture


WP2

  • EDUFI: Sami, Annica
  • CSC: Ari, Antti


Deployment

WP4

  • Gradia: Tarja
  • CSC:
    Ari, Antti, Anu
  • EDUFI
    Sami, Topias


 

  

 Links here


Framework architecture


Modules


User scenarios

Architecture aspects? - how does this differ from previous?


System requirements to be linked

       

M17-M22

April-September

Link to detailed plan

M17-M22

April-September

Link to detailed plan

Timetable?

Which deliverable?

 

Link to communication calendar and stakeholder management

Del 27 Pilot deployment of the architecture 

Del 30 Report on pilot deployent of the architecture

Impact evaluation study 

Analytics prototype

  • competence visualizations


  • education recommendations


  • suosittelukomponentin osalta liian myöhäistä teknisesti tässä vaiheessa (Petri)
  • Jotain muuta kuin kiinteä kivijalka learner planissä
  • Onko mahdollista tehdä erillisenä komponenttina - Oulusta tuotettava komponentti mahdollista lisätä jollain toisella aikataululla (voidaan osoittaa että olisi toimiva - demoaminen ilman käyttöliittymää)
  • OPH:n tietohallinnon tilaukset (semanttinen algoritmiikka) ja niiden hyödyntäminen (Annica) - Paulin diat
  • Erikoistunut kompetenssiprofiili voi olla haaste
  • Hannilla henkilön kompetenssikuvaus - data science, machine learning - tuotekehitysosaaminen?
  • Yksin tekeminen ei ole realiteetti - osa muuta työtä
  • Koosteena sähköposti joka lähetettävissä Susanna Pirttikankaalle


WP2 TF-LEA

  • UOulu: Hanni, Egle,
  • EDUFI:  


Deployment

WP4

  • Gradia: Tarja
  • UOulu: Hanni, Egle, Antti K.
  • CSC:  Antti, Anu
  • EDUFI  Topias

 

  

Visualisation ideas based on desk research (literature) and reference group generated ideas in workshops

Educations recommendation desk research (literature)

Deafinition


Definition of data sources and Integration of in and outputs to the visualisations


Recommendation system needs for analytics and algorithm availability












Link to communication calendar and stakeholder management

 
Deliverable 28 Pilot deployment of analytics prototype

Learner plan prototype incl 3 modules

  • local service integrations - KOSKI, Diploma register (past)

  • competence profile (present)


  • suggestions - education opportunities (future)
     


 WP3

  • EDUFI: Annica, Marcus, Outi
  • Reaktor 


Deployment

WP4

  • Gradia: Tarja
  • EDUFI: Annica, Topias
  • UOulu:
  • CSC:  Antti, Anu

 

  


LinkLinkLinkReady? LinkedOngoing - link separate page for detailed plan



 

Link to communication calendar and stakeholder management

Deliverable 26 Three prototypes (modules)

Deliverable 29 Pilot deployment of learner plan prototype


Compleap- Europass case study (WP5)

WP5

DUO: Vera, Monique


                 
Deliverables across work packages   

Deliverable 18 Detailed description of the user scenarios with guidelines and advice for developers in WP3

Deliverable 21 Feedback and specifications to user scenarios




Deliverable 25 Technical documentation, including glossary, model and architecture



Deliverable 24 Open source code for all components, including example code

 






 M15 ( February 2019) M16 (March 2019)M17 (4/2019)M18 (5/2019)M19 (6/2019) M20 (7/2019)M21 (8/2019) M22 (9/2019) M23 (10/2019) M24 (11/2019) 
WP1: Project management (CSC) Del 3.Standard management report Q3         
    Del 7. Standard progress report P3      
          Del 9. Project management and steering group meetings 
          Del 11: Final report
WP2: Requirements and architecture design (EDUFI)Del 15. Desk research (re-submitted)


      
 Del 18. Detailed description of the user scenarios (re-submitted)          
    Del 20. Running prototypes in cooperation with WP3      
    Del 21. Feedback and specifications to user scenarios      
      Del 22. Final seminar in cooperation with WP 4 and WP5 (must be re-scheduled because of summer)     
         Del 23. Sustainability plan (Document) 
TF Learning analytics  (UOulu)          
WP3: Prototype development (EDUFI)


Del 24 Open source code for all components including example code      




Del 25. Technical documentation, including glossary, model and architecture       
     Del 26. Three prototypes       
WP4: Deployment and (Gradia)evaluation   Del 27.Pilot deployment of the architecture (Pilot)  
   Del 28. Pilot deployment of the learning analytics prototype (Pilot)  
   Del 29. Pilot deployment of the learner plan prototype (Pilot)   
      Del 33 Impact evaluation study in cooperation with WP1 (Document) 
WP5: Dissemination and (DUO)communication Del 38. Presentations and publications (Other) 
 Del 39. Targeted workshops and seminars in cooperations with WP2 (Event) 
 Del 35. Stakeholder management plan (re-submitted) (Document)          

...