Main goals and project results | Responsible / Work package | Identified risks | Key Performance Indicators (KPI) - measurements | Definition of concept | Definition of functionalities for prototypes | Development of prototypes (WP3) | Deployment | Communication and dissemination (WP5) | Deliverables across timeline | Evaluation | ||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Ecosystem and modules user scenarios | Main architecture aspects and system requirements | Initial functionalities incl. interface, content and associated services | Reference group review of functionalities | Finalized definition of functionalities incl. interface, content and associated services | Mock up | HTML | Pilot prototype May | Pilot prototype August | Public versions (do we need this - all versions public?) | National deployment (Finland - all prototypes) | International deployment (Netherlands, Germany + possible other countries) | |||||||
Framework architecture | WP2
Deployment WP4
| Links here Framework architecture Modules User scenarios | Architecture aspects? - how does this differ from previous? System requirements to be linked | M17-M22 April-September Link to detailed plan | M17-M22 April-September Link to detailed plan | Link to communication calendar and stakeholder management | Del 27 Pilot deployment of the architecture Del 30 Report on pilot deployent of the architecture | Impact evaluation study | ||||||||||
Analytics prototype
| WP2 TF-LEA
Deployment WP4
| Visualisation ideas based on desk research (literature) and reference group generated ideas in workshops Educations recommendation desk research (literature) | Definition of data sources and Integration of in and outputs to the visualisations Recommendation system needs for analytics and algorithm availability | Link to communication calendar and stakeholder management | Deliverable 28 Pilot deployment of analytics prototype | |||||||||||||
Learner plan prototype incl 3 modules
| WP3
Deployment WP4
| Link | Link | Link | Ready? Linked | Ongoing - link separate page for detailed planDeveloping and releasing the initial version of the Beta prototype (Beta part 1) by Month 18 and the full Beta version (Beta part 2) by Month 22); | Developing and releasing the initial version of the Beta prototype (Beta part 1) by Month 18 and the full Beta version (Beta part 2) by Month 22); | Link to communication calendar and stakeholder management | Deliverable 26 Three prototypes (modules) Deliverable 29 Pilot deployment of learner plan prototype | |||||||||
Deliverable 15: Desk research - re-submitted by March 14th | EDUFI | |||||||||||||||||
Deliverable 18: DEtailed description of the user scenarios - re-submitted by March 14th | EDUFI | |||||||||||||||||
Deliverable 35: Stakeholder Management plan - re-submitted by March 14th | DUO | |||||||||||||||||
Deliverable 14: Risk management plan - re-submitted by March 14th D14 should be resubmitted and include a contingency plan to mitigate the delays in WP3 and reach the stated project objectives. | CSC | |||||||||||||||||
Provide additional documents concerning the Development of the Beta prototype (WP3) - by M18: (Developing and releasing the initial version of the Beta prototype (Beta part 1) by Month 18 and the full Beta version (Beta part 2) by Month 22); - Detailing the criteria adopted for selecting key functionalities to be developed in the Beta version; - Developing a detailed plan for the piloting of the Beta prototype (WP3); - Developing a detailed deployment plan of the Beta prototype (WP4).
| EDUFI + others contributing | |||||||||||||||||
"Living documents" – reference to the Grant Agreement – Description of the Action, table 2) Deliverables, page 23: Deliverables with an open "Delivery date", for example: M6-M18:, the draft deliverable should be uploaded on the Eduuni workspace and updated regularly. Submission to the EC in the last due month. | CSC
EDUFI
Gradia
DUO
| |||||||||||||||||
Compleap- Europass case study (WP5) | WP5 DUO: Vera, Monique | |||||||||||||||||
Deliverables across work packages | Deliverable 18 Detailed description of the user scenarios with guidelines and advice for developers in WP3 Deliverable 21 Feedback and specifications to user scenarios | Deliverable 25 Technical documentation, including glossary, model and architecture | Deliverable 24 Open source code for all components, including example code |
...