Deliverable 8 (living document in connection to Modified project plan)
From Annex I
WP2
In this work package, the ecosystem architecture is devised and it is used as a reference throughout the project
..
This WP is to define the framework for the project including the definition of the user scenarios, main architecture aspects and system requirements that will be exploited by the other WPs. The goal is to look into various processes within ecosystem, describe in detail every user scenario and finally design the prototype versions.
WP3
The lead of the work package, Finnish National Agency for Education, produces a testable prototypes that consists of an interface, content and associated services. The results of these tests are used to refine the prototype leading to a blueprint for the actual deployment in the WP4. The iterative development process runs within partner organisation in the Netherlands and results in a final product that is the project will aim to implement at least in Finland in the Netherlands. The testing will aim to involve different user groups from young adults to immigrants and refugees. In addition, number of interested reference group members have expressed their interest to participate in the development and testing.
WP4
This work package will deploy and evaluate the concept and prototypes that have been previously developed in the WP2, WP3 and WP4. The aim is that the partners that have been involved in the task forces will deploy the developed prototypes in their surroundings and use them to support the various user groups, including immigrants and their integration to society through more informed skills formation structures. Besides prototypes deployment in different countries and partners, Finland aims to deploy all developed prototypes, the ecosystem concept, to measure the effectiveness, usability, and/or feasibility of the technology and concept.
Main goals and project results | Responsible / Work package | Identified risks | Key Performance Indicators (KPI) - measurements | Definition of concept | Definition of functionalities for prototypes | Development of prototypes (WP3) | Deployment | Communication and dissemination (WP5) | Deliverables across timeline | Evaluation | ||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Ecosystem and modules user scenarios | Main architecture aspects and system requirements | Initial functionalities incl. interface, content and associated services | Reference group review of functionalities | Finalized definition of functionalities incl. interface, content and associated services | Mock up | HTML | Pilot prototype May | Pilot prototype August | Public versions (do we need this - all versions public?) | National deployment (Finland - all prototypes) | International deployment (Netherlands, Germany + possible other countries) | |||||||
Framework architecture | WP2
Deployment WP4
| Links here Framework architecture Modules User scenarios | Architecture aspects? - how does this differ from previous? System requirements to be linked | M17-M22 April-September Link to detailed plan | M17-M22 April-September Link to detailed plan | Link to communication calendar and stakeholder management | Del 27 Pilot deployment of the architecture Del 30 Report on pilot deployent of the architecture | Impact evaluation study | ||||||||||
Analytics prototype
| WP2 TF-LEA
Deployment WP4
| Visualisation ideas based on desk research (literature) and reference group generated ideas in workshops Educations recommendation desk research (literature) | Definition of data sources and Integration of in and outputs to the visualisations Recommendation system needs for analytics and algorithm availability | Link to communication calendar and stakeholder management | Deliverable 28 Pilot deployment of analytics prototype | |||||||||||||
Learner plan prototype incl 3 modules
| WP3
Deployment WP4
| Link | Link | Link | Ready? Linked | Developing and releasing the initial version of the Beta prototype (Beta part 1) by Month 18 and the full Beta version (Beta part 2) by Month 22); | Developing and releasing the initial version of the Beta prototype (Beta part 1) by Month 18 and the full Beta version (Beta part 2) by Month 22); | Link to communication calendar and stakeholder management | Deliverable 26 Three prototypes (modules) Deliverable 29 Pilot deployment of learner plan prototype | |||||||||
Deliverable 15: Desk research - re-submitted by March 14th | EDUFI | |||||||||||||||||
Deliverable 18: DEtailed description of the user scenarios - re-submitted by March 14th | EDUFI | |||||||||||||||||
Deliverable 35: Stakeholder Management plan - re-submitted by March 14th | DUO | |||||||||||||||||
Deliverable 14: Risk management plan - re-submitted by March 14th D14 should be resubmitted and include a contingency plan to mitigate the delays in WP3 and reach the stated project objectives. | CSC | |||||||||||||||||
Provide additional documents concerning the Development of the Beta prototype (WP3) - by M18: (Developing and releasing the initial version of the Beta prototype (Beta part 1) by Month 18 and the full Beta version (Beta part 2) by Month 22); - Detailing the criteria adopted for selecting key functionalities to be developed in the Beta version; - Developing a detailed plan for the piloting of the Beta prototype (WP3); - Developing a detailed deployment plan of the Beta prototype (WP4).
| EDUFI + others contributing | |||||||||||||||||
"Living documents" – reference to the Grant Agreement – Description of the Action, table 2) Deliverables, page 23: Deliverables with an open "Delivery date", for example: M6-M18:, the draft deliverable should be uploaded on the Eduuni workspace and updated regularly. Submission to the EC in the last due month. | CSC
EDUFI
Gradia
DUO
| |||||||||||||||||
Compleap- Europass case study (WP5) | WP5 DUO: Vera, Monique | |||||||||||||||||
Deliverables across work packages | Deliverable 18 Detailed description of the user scenarios with guidelines and advice for developers in WP3 Deliverable 21 Feedback and specifications to user scenarios | Deliverable 25 Technical documentation, including glossary, model and architecture | Deliverable 24 Open source code for all components, including example code |
M15 ( February 2019) | M16 (March 2019) | M17 (4/2019) | M18 (5/2019) | M19 (6/2019) | M20 (7/2019) | M21 (8/2019) | M22 (9/2019) | M23 (10/2019) | M24 (11/2019) | |
---|---|---|---|---|---|---|---|---|---|---|
WP1: Project management (CSC) | Del 3.Standard management report Q3 | |||||||||
Del 7. Standard progress report P3 | ||||||||||
Del 9. Project management and steering group meetings | ||||||||||
Del 11: Final report | ||||||||||
WP2: Requirements and architecture design (EDUFI) | Del 15. Desk research (re-submitted) | |||||||||
Del 18. Detailed description of the user scenarios (re-submitted) | ||||||||||
Del 20. Running prototypes in cooperation with WP3 | ||||||||||
Del 21. Feedback and specifications to user scenarios | ||||||||||
Del 22. Final seminar in cooperation with WP 4 and WP5 (must be re-scheduled because of summer) | ||||||||||
Del 23. Sustainability plan (Document) | ||||||||||
TF Learning analytics (UOulu) | ||||||||||
WP3: Prototype development (EDUFI) | Del 24 Open source code for all components including example code | |||||||||
Del 25. Technical documentation, including glossary, model and architecture | ||||||||||
Del 26. Three prototypes | ||||||||||
WP4: Deployment and (Gradia)evaluation | Del 27.Pilot deployment of the architecture (Pilot) | |||||||||
Del 28. Pilot deployment of the learning analytics prototype (Pilot) | ||||||||||
Del 29. Pilot deployment of the learner plan prototype (Pilot) | ||||||||||
Del 33 Impact evaluation study in cooperation with WP1 (Document) | ||||||||||
WP5: Dissemination and (DUO)communication | Del 38. Presentations and publications (Other) | |||||||||
Del 39. Targeted workshops and seminars in cooperations with WP2 (Event) | ||||||||||
Del 35. Stakeholder management plan (re-submitted) (Document) |