Main goals and project results | Responsible / Work package | Identified risks | Key Performance Indicators (KPI) - measurements | Definition of concept | Definition of functionalities for prototypes | Development of prototypes (WP3) | Deployment | Communication and dissemination (WP5) | Deliverables across timeline | Evaluation | ||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Ecosystem and modules user scenarios | Main architecture aspects and system requirements | Initial functionalities incl. interface, content and associated services | Reference group review of functionalities | Finalized definition of functionalities incl. interface, content and associated services | Mock up | HTML | Pilot prototype May | Pilot prototype August | Public versions (do we need this - all versions public?) | National deployment (Finland - all prototypes) | International deployment (Netherlands, Germany + possible other countries) | |||||||
Framework architecture | WP2
Deployment WP4
| Links here Framework architecture Modules User scenarios | Architecture aspects? - how does this differ from previous? System requirements to be linked | M17-M22 April-September Link to detailed plan | M17-M22 April-September Link to detailed plan | Link to communication calendar and stakeholder management | Del 27 Pilot deployment of the architecture Del 30 Report on pilot deployent of the architecture | Impact evaluation study | ||||||||||
Analytics prototype
| WP2 TF-LEA
Deployment WP4
| Visualisation ideas Competence visualisation based on desk research (literature) and reference group generated ideas in workshops Educations recommendation desk research (literature) | Definition of data sources and Integration of in and outputs to the visualisations Recommendation system needs for analytics and algorithm availability | Link to communication calendar and stakeholder management | Deliverable 28 Pilot deployment of analytics prototype | |||||||||||||
Learner plan prototype incl 3 modules
| WP3
Deployment WP4
| Link | Link | Link | Ready? Linked | Developing and releasing the initial version of the Beta prototype (Beta part 1) by Month 18 and the full Beta version (Beta part 2) by Month 22); | Developing and releasing the initial version of the Beta prototype (Beta part 1) by Month 18 and the full Beta version (Beta part 2) by Month 22); | Link to communication calendar and stakeholder management | Deliverable 26 Three prototypes (modules) Deliverable 29 Pilot deployment of learner plan prototype | |||||||||
Deliverable 15: Desk research - re-submitted by March 14th | EDUFI | |||||||||||||||||
Deliverable 18: DEtailed description of the user scenarios - re-submitted by March 14th | EDUFI | |||||||||||||||||
Deliverable 35: Stakeholder Management plan - re-submitted by March 14th | DUO | |||||||||||||||||
Deliverable 14: Risk management plan - re-submitted by March 14th D14 should be resubmitted and include a contingency plan to mitigate the delays in WP3 and reach the stated project objectives. | CSC | |||||||||||||||||
Provide additional documents concerning the Development of the Beta prototype (WP3) - by M18: (Developing and releasing the initial version of the Beta prototype (Beta part 1) by Month 18 and the full Beta version (Beta part 2) by Month 22); - Detailing the criteria adopted for selecting key functionalities to be developed in the Beta version; - Developing a detailed plan for the piloting of the Beta prototype (WP3); - Developing a detailed deployment plan of the Beta prototype (WP4).
| EDUFI + others contributing | |||||||||||||||||
"Living documents" – reference to the Grant Agreement – Description of the Action, table 2) Deliverables, page 23: Deliverables with an open "Delivery date", for example: M6-M18:, the draft deliverable should be uploaded on the Eduuni workspace and updated regularly. Submission to the EC in the last due month. | CSC
EDUFI
Gradia
DUO
| |||||||||||||||||
Compleap- Europass case study (WP5) | WP5 DUO: Vera, Monique | |||||||||||||||||
Deliverables across work packages | Deliverable 18 Detailed description of the user scenarios with guidelines and advice for developers in WP3 Deliverable 21 Feedback and specifications to user scenarios | Deliverable 25 Technical documentation, including glossary, model and architecture | Deliverable 24 Open source code for all components, including example code |
...